PRT @LHR 2010 – Summary of Personal Rapid Transit Conference at Heathrow Airport – Days Two and Three

Saturday, September 25th, 2010

Wednesday – Thursday 22nd – 23rd September 2010

I attended the morning tour of the PRT system thereby missing the first four Wednesday presentations. I had previously seen and ridden on the entire system. However, I had not seen the T-5 station since it was completed. It is an elegant and well-designed facility that appears to have ample space. Strolling around it, one appreciates some of the difficulties of designing for a system few will initially understand. For example, when passengers read “wait here for an empty berth” will they understand what a berth is and be able to determine where one ends and another begins? During the remainder of the tour and the ride the following morning (the system was closed for track maintenance on Wednesday morning), I paid attention to the opinions of others. Perhaps most telling was the comment of a Bombardier representative who indicated the system was much better than he had expected. I was interested in better evaluating the ride quality which, while not perfect, is definitely better than that in the back seat of a taxi.

Sven Beller, PTV AG, discussed the adaptation of existing tools such as VISUM and VISSIM to simulate PRT systems. Necessary adaptations can be scripted through the Application Programming Interface using other tools such as Excel’s Visual Basic for Applications.

Joerg Schweizer, Universita di Bologna presented work he is doing on a PRT Capacity Manual. The manual is intended to provide performance models that are quick and easy to apply with a focus on station operations.

Jochen Rabe, Associate, Ove Arup & Partners Ltd., said that comprehensive PRT networks covering entire cities may not be realistic. Local authorities must compare the transport service benefits of PRT with the visual impact and potential privacy loss.

Gabriele Giustiniani, Researcher, University of Rome ‘La Spienza’, outlined a CityMobil project with a round trip of 1.61km, 11 stops and 6 cybercars. He found the mode share for the cybercars was 10% more than that for a mini bus with the same schedule.

Steve Perliss, Lea+Elliott moderated a Procurement Workshop which included addresses from Bo Olsson, Senior Strategist, Trafikverket, David Holdcroft, PRT Manager, BAA, Martin Lowson, President, ULTra PRT, Robbert Lohman, Commercial Director, 2getthere and Jorgen Gustafsson, Managing Director, Vectus Ltd. Olsson described a two-step procurement process (first qualifications, then price) and said numerous questions must be answered before committing to a procurement process. Holdcroft described the process used to select ULTra. He said they received 15 responses. Lowson and Lohman implied they approved of the BAA procurement process. Perliss said it is important to give responders time to build teams and to bring them in early to get feedback. Ahuja said this is not possible in India where the tender period is limited to 6-8 weeks. Lowson and Lohmann agreed that the supplier must have control of the structural specifications to ensure ride quality and vehicle interfaces are adequate. Gustafsson said clear roles and responsibilities with simple interfaces and a lean organization able to make quick decisions (especially on the client side) were important. He said the Suncheon project will comprise 11km, 40 vehicles with 3M annual visitors. It will be mainly point-to-point and is being financed by Vectus who will receive an annual stipend. Muller pointed out that the workshop seemed to be moving towards guidance for consultants in preparing tender documents and that guidance for owners in moving from considering to implementing PRT was perhaps also needed. Lowson stated that, in his opinion, the ASCE APM standards are insufficient on the topic of safety and that safety clearance requirements vary greatly from country to country and even within some countries like the U.S.A.

Simon Babes, Director, Colin Buchanan, discussed a potential role for PRT in the Chinese megacity of Shanghai. He presented an analysis of a 20km, 20 station PRT system with 500 vehicles and 67,000 daily trips connecting a business park to a metro station. He anticipated fare revenues plus savings in shuttle bus operating costs could cover PRT operating costs and pay back the capital investment in five to ten years.

Richard Caple, Engineer Project Manager, Daventry District Council, said the major concerns for the Daventry PRT project include: visual intrusion; cost; anti-social behavior; ease of use and the complexity of the network. There is no funding presently available but he expects the system will happen eventually. He briefly outlined a document called Outlines for the Implementation of PRT in Urban Areas.

Peter Muller, President, PRT Consulting (the author), suggested that the true benefits of PRT will only be realized when it is used to develop entirely new cities built with a focus on ideal living conditions along with sustainability. He outlined how his vision for a “perfect” city could be enabled by PRT and recommended that those attempting to retrofit existing cities with PRT might want to keep this vision in mind, as something to strive towards. A poll of the audience revealed that about 75% would like to live in such a city.

Colin Bates, Managing Director, Customer Champions reported on a study of ULTra’s previous leads and key contacts. They found that the key barriers to sales were: risk aversion; desire not to be first (Heathrow will help but is not always applicable); urban developments are impacted by politics; PRT is not understood by decision makers; there is a lack of comparable data and proven benefits.

Malcolm Buchanan, Director, Colin Buchanan, summarized the conference. He asked if roads and cars or rail networks could eventually become PRT networks.

Mn/DOT Personal Rapid Transit (PRT) Workshop

Sunday, August 22nd, 2010

A PRT Workshop was hosted by Mn/DOT on August 18, 2010 in the Radisson University Hotel in Minneapolis, Minnesota. The purpose of the workshop was to share responses to Mn/DOT’s request for PRT information and to allow participants to understand PRT benefits and barriers to its implementation and explore the viability of PRT in Minnesota. This blog attempts to succinctly capture what was said and the essence of the workshop which was attended by approximately 100 people with a wide variety of interests in PRT.

Opening Comments

Tom Sorel, Commissioner of the Mn/DOT, said the DOT has an obligation to the citizens to be on the leading edge of all technologies.

Derrell Turner, Division Administrator, FHWA, said that PRT technology fits in well with U.S. Secretary of Transportation, Ray LaHood’s livability and sustainability initiatives. 

Jeff Hamiel, Executive Director, Metropolitan Airports Commission, said that, while the community is still automobile-based, PRT emulates many aspects of the car. PRT appears to be economical, safe, reliable, sustainable and comfortable.

Arlene McCarthy, Director, Metropolitan Council, said we must consider how PRT complements and integrates with the entire system. Funding is a struggle and she questioned if PRT will be a potential drain on public funds. She also asked if PRT promotes good land use.  The Council does not support public funds going to PRT.

Summary of RFI Responses

Mukhtar Thakur, Director, Office of Multimodal Innovation, Mn/DOT said that all responses have been posted at              http://www.dot.state.mn.us/transit/prt/PRTPublicRFISubmittals.pdf He said there are issues to be addressed when trying to establish the feasibility of a PRT application, namely: aesthetics, how it fits in the current land form and surrounding land uses, ROW, and how it’s going to be funded, O&M costs, among others. He summarized the 21 responses to the RFI and found the following to be of interest:

PRT system technologies

  • Hanging pods vs. pods that travel along a guideway or track
  • Magnetically levitated pods vs. motor driven pods
  • True PRT systems vs. quasi PRT systems
  • Fare collection

Costs (planning level) ranged from $8M to $21M per mile

Financing ideas

  • Govt, PPP, Private & Community Interest Company

Aesthetics of various systems

Level of PRT experience among vendors & consultants

Speeds 25 mph – 60 mph

Headways 0.5s – 10s

Timeline from NTP to revenue service 15 – 48 months

In Minnesota there may be interest in PRT in Bloomington, Maple Grove, Ford Plant Site, Edina, Richfield and Winona. Nationally studies are under way or completed in San José, New Jersey and Virginia.

RFI Responders Comments & Reactions from Attendees

Carlos Espinoza with the City of Winona announced that they did not receive an FTA grant. The FTA suggested they consider New Starts funding and/or Section 5309 research funding for a pilot project.

Mike Lester with Taxi 2000 recommended that ASCE APM Standards be used to see how different systems comply.

Dennis Sweet with Citizens for PRT recommended three roles for Mn/DOT:

  1. System requirements
  2. Developing capital & operating costs
  3. Collaborating with other states and communities for common standards

Christopher Perkins with Skytran recommended an aviation risk management model would be more applicable and could avoid incompatibility with legacy requirements.

Policy Issue Panel Discussion

Steve Elkins, Council Member, Bloomington City Council indicated that, while Bloomington is interested in PRT, it does not want to be a guinea pig. If a vendor builds a working system as an amusement park ride at the Mall of America/IKEA site, the city will consider providing them ROW.

Senator David Senjem, MN State Legislature, said he does not think PRT has a champion in Minnesota. Every cause needs a champion. The legislative process is not analytical. This is new to the legislature and they will need a lot of education. Start by selling it locally then request the State match local funds. A demonstration project is absolutely vital.

Barb Thorman, Executive Director, Transit for Livable Communities, said her organization has been publicly critical of PRT but it is good that the conversation has turned to a mix of modes, not one vs. the other. Where does PRT fit in the mix?

Representative Frank Hornstein, MN State Legislature, said he is a PRT skeptic and will stick to demonstrated successful systems until PRT is demonstrated to be successful. He agrees that transportation policy has to focus on reduction in dependence on oil.

Keynote Presentation

Curt Johnson, President, Citistates Group said the major impediment to PRT rolling out has been policy and politics. It is important we get the transportation question right – access – not just mobility. PRT can intensify the use of activity-rich zones – reducing unwelcome auto use, reducing air and noise pollution and raising the quality of life. There is a tendency to overestimate technology in the short term and under estimate it in the long team.

Facilitated Group Discussions

The group brainstormed impediments to PRT implementation, anticipated PRT benefits and principles for PRT deployment in Minnesota.

Dean Zimmerman said people love cars because they wait for you, go directly to your destination and keep you out of the weather. PRT satisfies all three and erases the negatives associated with cars.

There was general discussion of what to do next – select a location? No political will – need a public process? Winona could work with a league of MN cities? Join CPRT? Need to define purpose and need.

Summary Comments & Next Steps

Mukhtar Thakur said that nobody is offering funding. A different model is needed than asking the legislature. Cities are trying to move ahead. Where do we go from here? Is there another Mn/DOT Forum? How do we communicate? Mn/DOT will consider all of the input and decide what next.