PRT Testing

The construction, manufacturing, installation and operation of a PRT system must be thoroughly tested to ensure compliance with specified requirements for such items as:

•  Operating environment
•  Safety
•  Dependability
√  Reliability
√  Maintainability
√  Availability
•  Capacity
•  Scalability
•  Control system
•  Automatic vehicle protection system
•  Vehicle health and usage monitoring system
•  Audio and visual communications
•  Vehicle design and manufacturing
√  Capacity and load
√  Dynamic envelope
√  Clearance in stations
√  Structural design
√  Aesthetic design
√  Suspension and guidance
√  Passenger comfort
√  Doors, access and egress
√  Windows
√  Fire protection and flammability
√  Lighting
√  Electrical systems
√  Propulsion and braking
•  Electrical Equipment
√  Traction power substation equipment
√  Wayside power collection
√  Station electrical equipment
√  Uninterruptible power supply
•  Stations
√  Location
√  Architecture
√  ADA compliance
√  Platform edge protection
√  Emergency lighting and ventilation
√  Fire protection
•  Guideways
√  Architecture
√  Blue light stations
√  Intrusion protection and detection
√  Emergency evacuation and access
√  Fire protection
√  Signage
√  Emergency lighting and ventilation
√  Emergency power supply
√  Alignment
√  Structural criteria
•  Maintenance/Storage facility
√  Location
√  Architecture
√  Site
√  Structural
√  Mechanical
√  Electrical
√  HVAC
√  Security
√  Emergency preparedness
√  System verification and demonstration
√  System acceptance
√  Operations, maintenance and training
√  Operational monitoring
•  System safety certification